Bambu Proje-Danışmanlık logo Bambu Proje-Danışmanlık WhatsApp
Manisa · Law No. 5403

Project Technical Report and Soil Conservation Project in Manisa

Our ZMO-registered office prepares the report you need for a barn, a greenhouse, a storage building or non-agricultural use. You send your documents via WhatsApp, and the signed report comes to your address by courier.

Farm buildings at the foot of a mountain
Reporting under Law No. 5403 for Manisa
Office registered with TMMOB ZMO Project Technical Report in 2-3 days Printed report by courier, shipping on us
Agriculture in Manisa

The files we prepare most often in Manisa

With the Gediz plain, Manisa is one of Türkiye's leading agricultural provinces. Seedless raisin vineyards stand out in Alaşehir, Sarıgöl, Salihli and Turgutlu, olives in Akhisar and Soma, and cattle farming around Saruhanlı and Salihli. Storage, animal shelter and processing buildings within vineyards and olive groves are requests we come across frequently.

In Manisa, in areas with many olive groves such as Akhisar and Soma, the distance rules of Law No. 3573 on the Improvement of Olive Growing and the Grafting of Wild Olive Trees (Zeytinciliğin Islahı ve Yabanilerinin Aşılattırılması Hakkında Kanun) are observed in addition to Law No. 5403. We prepare the project by assessing these two pieces of legislation together.

Project Technical Reports and permit files

  • Agricultural storage, drying and processing buildings for grapes and olives
  • Cattle and sheep and goat farming facility
  • Greenhouses and structures for protected cultivation
  • Poultry farming facilities
  • Permit for non-agricultural use and Soil Conservation Project
Working remotely

From Manisa: delivery in four steps

From our office in Denizli we serve every province of the Aegean region, including Manisa. Manisa is a neighbouring province of Denizli, so for files that require a land inspection it is also easy for us to come on site.

  1. 1Initial consultationWe discuss your investment and your block and parcel details on WhatsApp; the first assessment is free of charge.
  2. 2DocumentsWe send you the list of required documents; you send us the title deed, the location and photos of the land via WhatsApp or e-mail.
  3. 3Report preparationThe report is prepared in line with the legislation; if the land needs to be inspected on site, a visit is scheduled.
  4. 4Delivery by courierThe signed and stamped printed copy is sent to your address by courier; the tracking number is shared with you, and shipping is on us.

The Project Technical Report (Proje Teknik Raporu) is submitted to the Manisa Provincial Directorate of Agriculture and Forestry, and the Soil Conservation Project (Toprak Koruma Projesi) to the Manisa Governor's Office for approval. For payment options and the secure payment process, see the Payment and Security page.

Common Questions

Questions from Manisa

Can an office based outside Manisa prepare a report in Manisa?
Yes. The Project Technical Report and the Soil Conservation Project are prepared by agricultural engineers who are registered with the TMMOB Chamber of Agricultural Engineers and hold an SMM certificate (independent consulting engineer licence), regardless of the province in which the office is located. The application is made in the province where the land is located: the Project Technical Report is submitted to the Manisa Provincial Directorate of Agriculture and Forestry, and the Soil Conservation Project goes to the Manisa Governor's Office for approval.
When you work on a file from Manisa, do you need to visit the land?
For most files, no: the title deed, the block and parcel details, the location and photos of the land reach us via WhatsApp or e-mail, and the report is prepared on that basis. If the land needs to be inspected on site, we tell you so at the outset and plan the visit.
How is the report delivered to me?
The report is prepared as a signed and stamped printed copy and sent by courier to the address you give us; we share the tracking number with you. We cover the shipping costs.
How long does it take, and what does it cost?
The Project Technical Report is prepared within 2-3 days after the requested information and documents reach us, and the Soil Conservation Project within 5-7 working days (excluding the authority's review and approval time). The indicative fee for the Project Technical Report is 6,000 ₺ as a single payment or 6 × 1,250 ₺ in instalments (7,500 ₺ in total), VAT included. The Soil Conservation Project is priced on the same day on the basis of the block and parcel details.

Answers to all questions →

Our other service areas

Let's talk about your land in Manisa

Send us your block and parcel details and the investment you are planning, and we will get back to you the same day.