Bambu Proje-Danışmanlık logo Bambu Proje-Danışmanlık WhatsApp
Muğla · Law No. 5403

Project Technical Report and Soil Conservation Project in Muğla

Our ZMO-registered office prepares the report you need for a greenhouse, a storage building, a livestock facility or non-agricultural use. You send your documents via WhatsApp, and the signed report comes to your address by courier.

Agricultural land and rural buildings
Reporting under Law No. 5403 for Muğla
Office registered with TMMOB ZMO Project Technical Report in 2-3 days Printed report by courier, shipping on us
Agriculture in Muğla

The files we prepare most often in Muğla

Agriculture in Muğla is based on vegetable growing under protected cultivation and citrus fruit around Fethiye, Seydikemer, Ortaca and Dalaman, on olive growing around Milas and Yatağan, and on livestock farming and beekeeping in the inland areas. What farmers who want to build a greenhouse or an agricultural storage building need most often is a Project Technical Report (Proje Teknik Raporu).

We take into account from the outset that no building permit is granted on land registered as olive grove because of Law No. 3573 on the Improvement of Olive Growing and the Grafting of Wild Olive Trees, and that in the coastal areas, tourism and housing requests on agricultural land fall under the rules for non-agricultural use; we build the file on the actual situation of the land.

Project Technical Reports and permit files

  • Protected cultivation (greenhouse) facility
  • Agricultural storage for citrus fruit, vegetables and olive products
  • Sheep and goat and cattle farming facility
  • Permit for non-agricultural use and Soil Conservation Project
Working remotely

From Muğla: delivery in four steps

From our office in Denizli we serve every province of the Aegean region, including Muğla. Muğla is a neighbouring province of Denizli, and for files that require a land inspection it is also possible for us to come on site.

  1. 1Initial consultationWe discuss your investment and your block and parcel details on WhatsApp; the first assessment is free of charge.
  2. 2DocumentsWe send you the list of required documents; you send us the title deed, the location and photos of the land via WhatsApp or e-mail.
  3. 3Report preparationThe report is prepared in line with the legislation; if the land needs to be inspected on site, a visit is scheduled.
  4. 4Delivery by courierThe signed and stamped printed copy is sent to your address by courier; the tracking number is shared with you, and shipping is on us.

The Project Technical Report is submitted to the Muğla Provincial Directorate of Agriculture and Forestry, and the Soil Conservation Project (Toprak Koruma Projesi) to the Muğla Governor's Office for approval. For payment options and the secure payment process, see the Payment and Security page.

Common Questions

Questions from Muğla

Can an office based outside Muğla prepare a report in Muğla?
Yes. The Project Technical Report and the Soil Conservation Project are prepared by agricultural engineers who are registered with the TMMOB Chamber of Agricultural Engineers and hold an SMM certificate (independent consulting engineer licence), regardless of the province in which the office is located. The application is made in the province where the land is located: the Project Technical Report is submitted to the Muğla Provincial Directorate of Agriculture and Forestry, and the Soil Conservation Project goes to the Muğla Governor's Office for approval.
When you work on a file from Muğla, do you need to visit the land?
For most files, no: the title deed, the block and parcel details, the location and photos of the land reach us via WhatsApp or e-mail, and the report is prepared on that basis. If the land needs to be inspected on site, we tell you so at the outset and plan the visit.
How is the report delivered to me?
The report is prepared as a signed and stamped printed copy and sent by courier to the address you give us; we share the tracking number with you. We cover the shipping costs.
How long does it take, and what does it cost?
The Project Technical Report is prepared within 2-3 days after the requested information and documents reach us, and the Soil Conservation Project within 5-7 working days (excluding the authority's review and approval time). The indicative fee for the Project Technical Report is 6,000 ₺ as a single payment or 6 × 1,250 ₺ in instalments (7,500 ₺ in total), VAT included. The Soil Conservation Project is priced on the same day on the basis of the block and parcel details.

Answers to all questions →

Our other service areas

Let's talk about your land in Muğla

Send us your block and parcel details and the investment you are planning, and we will get back to you the same day.